Add to cart To the collection
Construction of the Severomuysky tunnel on the Baikal-Amur Mainline
USSR. Buryat ASSR. Members of the Bamtonnelstroy tunneling team I. Streltsov, V. Kostenko and R. Mukhametov (from left to right) during the construction of the Severomuysky tunnel on the Nizhneangarsk-Vitim section of the Baikal-Amur Mainline. Grigory Kalachyan, Vladimir Matvievsky/TASS
| Location: | USSR, Buryat ASSR |
| Photo: | №141563 |
| Date of shooting: | 02.25.1983 |
| Authors: | Kalachyan Grigory Matvievsky Vladimir |